SERTECPET
Slider

Success Stories

GM OBB

Assembly and Installation of Topcoat Paint Plants and Polymers.

Three-phase separator

Construction of three-phase separator

Río Napo

Construction of oil platforms in Sacha 450 and Sacha 480

Petroamazonas

Platform construction service, track and facilities for Auca 142 drill, block 61 – PAM EP.

Pardalis Services

Construction service for the revamping of the Power Oil system of the Shushuqui station and expansion of the slab cover of the transfer pumps.

Angola

Distinguished operating company in Angola increases its production by 35% and achieves great savings by installing the Jet Claw® hydraulic pumping system in the Castanha field.

Namoku

IPCM OF THE OFFSHORE PRODUCTION FACILITIES AT THE FPSO NAMOKU – PERU

Gran Tierra Lote 95

EPC FOR PRODUCTION FACILITIES LONG TERM TEST LOT 95 – PERU

Perenco Lote 67

IPC FOR PRODUCTION FACILITIES LONG TERM TEST LOT 67 – PERU